Gulf Coast Spa Logo
 
Delivery Requirements
 
  1. From trailer drop off to hot tub site a clear run of 38 inches with is needed. Please take into consideration all guttering, fascias, overhanging branches etc.
  2. A firm level base (decking, flagging, concrete etc.) with a minimum of 15 inches clear all around the tub.
  3. Hot tub electrical feed- 6MM 3Core steel wired armoured cable on a 32 AMP supply with RCD protection. Local isolation using rotary isolator.
  4. Please ensure that the cable tail end from isolator to the tub site has an additional 5 metres to ensure the perfect sitting of the hot tub.
  5. We want your hot tub experience to be as stress free and pleasurable as possible so please ensure that the above requirements are carried out prior to your delivery.
  6. If you have any concerns about the above information please contact us in ADVANCE of your delivery. Thankyou.